PROJECT TITLE | SCOPE OF WORK | CLIENT | CONTRACT PERIOD | REFERENCE |
---|---|---|---|---|
Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | Construction of Access Road for swampy areas and including mobilization and demobilization, supervision, manpower & operation cost | GEOTECH SOLUTIONS (U) Ltd | 17th February 2022 to 18th August 2022 | Mayanja Gibriel Project Lead Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Surveying, Geotechnical & geophysical investigations in Jiji-Mulembe HPP, Burundi for transmission lines | Surveying, geotechnical and geophysical investigations along the transmission line. | GEOTECH SOLUTIONS (U) Ltd | 2019 | Mayanja Gibriel Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Foundation, Erection & stringing works on towers for electrical transmission along Jiji-Mulembe HPP in Burundi. | Foundation works, tower erection and stringing of towers | GEOTECH SOLUTIONS (U) Ltd | 2020-2021 | Mayanja Girbriel Geotech Solutions (U) Ltd jbl@geotechsolutionsug.com |
Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | Platform arrangement with murram dumping & compaction in swampy locations 10/3, 10/4 & 12D | GEOTECH SOLUTIONS (U) Ltd | 17th February 2022 to 18th August 2022 | Mayanja Gibriel Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | Construction of Pad and Chimney foundations 10/2, 11/1, 12A and 12B | GEOTECH SOLUTIONS (U) Ltd | 17th February 2022 to 18th August 2022 | Mayanja Gibriel Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Geotechnical Investigations for 132/33 kV OHTL Gulu Agago Transmission Line | Vertical Electrical Sounding Testing, Borehole Drilling, Trial Pit Excavations, DPL Testing + Laboratory Testing | GEOTECH SOLUTIONS (U) Ltd | Jan 2022 to Dec 2022 | Mayanja Gibriel Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Geotechnical Investigations for Namalu and Unyama Large Scale Irrigation Schemes | Geological Mapping, Electrical resistivity topography and Seismic refraction, Borehole Drilling, Trial Pit Excavations + Laboratory Testing | GEOTECH SOLUTIONS (U) Ltd | June 2022 to October 2022 | Mayanja Gibriel Geotech Solutions (U) Ltd info@geotechsolutionsug.com |
Tower foundation and erection Gulu Agago Transmission line, Nebbi-Arua line | Excavation, construction, tower erection works | BTH (U) LTD | June 2022 to October 2022 | KITIMBO MARIA Manager BTH LIMITED info@bth.ltd www.bth.ltd |
Concrete Grouting works at Biomass feeder section at Uganda Breweries Limited | Grouting of cracked concrete section for Biomass feeder section | BTH (U) LTD | January 2023 | KITIMBO MARIA Manager BTH LIMITED info@bth.ltd www.bth.ltd |
PROJECT TITLE | SCOPE OF WORK | CLIENT | CONTRACT PERIOD | REFERENCE |